Operation Manual

Training
Use of the unit requires adequate lesson by a professional or the use of the manual only. Special training is not required.
Technical Data
GRH 350
Carrying Capacity 2 t
Headway 135 mm
Maximum height 345 mm
Ordering No. 18019
Transportation and Storage
Keep the sliding lifting jack and the plastic case included in the delivery to protect it from ambient effects. .
Assembly and Initial Operation
Structural Group 1 Delivery-contained parts and
accessories
Fig. 2
Fig. 1 – Pos. 7
Fig. 1 – Pos. 4
Fig. 1 – Pos. 3
Operation
Lifting
Fig. 3
Having put the lifting rod (Fig. 1/Pos. 3) on, close the
bleeding valve (Fig. 1/Pos. 8) by turning to the right to
the stop.
Put the lifting jack under the vehicle to be lifted. Watch
out for the mark on the vehicle (see the vehicle
operating manual).
13