Operation Manual

GB
Assembly and Initial Putting in Operation
Assembly Group 1 Parts of Delivery
Fig. 2
Fig. 1 – Pos. 2
Fig. 1 – Pos. 5
Fig. 1 – Pos. 6
Fig. 1 – Pos. 7
Assembly Group 2 Parts of Delivery
Fig. 3
Fig. 1 – Pos. 2
Fig. 1 – Pos. 3 / 2x
Fig. 1 – Pos. 4
Fig. 1 – Pos. 12
Assembly Group 4 Assembly Groups Required Parts of Delivery
Fig. 5
Assembly Group 3 Fig. 1 – Pos. 9
Fig. 1 – Pos. 10
Fig. 1 – Pos. 12
Safety Instructions for First Putting in Operation
• Check the power supply for sufficient protection (16 A, inertial)
• Wear required clothing (see Fig. 6)
• Make sure that no other persons are present on the working site or the area of hazard.
• Take care for no inflammable material being on the site.
16










