Operation Manual

GB
Assembly and Initial Putting in Operation
Assembly Group 1 Parts of Delivery
Fig. 2
Fig. 1 – Pos. 2
Fig. 1 – Pos. 5
Fig. 1 – Pos. 6
Fig. 1 – Pos. 7
Assembly Group 2 Parts of Delivery
Fig. 3
Fig. 1 – Pos. 2
Fig. 1 – Pos. 3 / 2x
Fig. 1 – Pos. 4
Fig. 1 – Pos. 12
Assembly Group 4 Assembly Groups Required Parts of Delivery
Fig. 5
Assembly Group 3 Fig. 1 – Pos. 9
Fig. 1 – Pos. 10
Fig. 1 – Pos. 12
Safety Instructions for First Putting in Operation
Check the power supply for sufficient protection (16 A, inertial)
Wear required clothing (see Fig. 6)
Make sure that no other persons are present on the working site or the area of hazard.
Take care for no inflammable material being on the site.
16