Product Manual

Guardian Fall Protection 6305 S. 231st St., Kent, WA 98032 phone: (800) 466-6385 fax: (800) 670-7892 www.guardianfall.com
5
Installation:
MAXIMUM 2 workers or 500 lbs. per successive Support Brackets.
1. On 3’ long, 2” x 4” Support Brace, mark desired Support Bracket attachment location, making sure Support
Bracket will cross at least three wall studs at selected installation location, even at sheer areas.
2. Nail selected 2” x 4”, 3’ Support Brace to Support Bracket at layout mark. DO NOT drive nail flush, as it must
be removed during disassembly. Support Bracket might not always be centered on Support Brace. DO NOT nail
Support Brace to wall.
3’ long, 2” x 4” Support Brace
MUST cross MINIMUM
3 wall studs
3. Attach Top Clamps to Support Brackets:
1) Ensure Top Clamp is sized correctly for applicable installation location (see pg. 2).
2) Turn Threaded Bolt Nut until snug to secure Threaded Bolt in Top Clamp Housing (nut MUST NOT be
installed on opposite side of Support Bracket).
3) Apply a small amount of thread lubrication to Eyebolt.
4) Insert Top Clamp Peg and Threaded Bolt through corresponding Support Bracket holes.
5) Use a socket wrench to tighten Threaded Bolt until it is fully secured in Support Bracket. DO NOT insert
Hitch Pin until after Eyebolt is tightened onto rail (see steps 7 and 8).
Hitch Pin
Threaded Bolt
Eyebolt
Top Clamp
Top Clamp Peg
Threaded Bolt
Sheathing
Threaded Bolt Nut