Prior to Disassembly:
Ensure all necessary carpentry is complete, including:
1) All roof vents and frieze blocks installed.
2) All fascia completed.
3) All roof sheeting and railing done. Holes cut for heat as applicable.
4) Fireplace stacks, pop-outs, skylights, dormers, and all other protrusions from surface are complete.
5) Chevrons at gable ends.
6) Tile kick at eve installed.
Disassembly:
1. Ensure caution tape or other sufficient barrier is in place around the entire applicable work area.
2. Ensure sufficient and proper fall safety equipment is used during disassembly.
3. Remove all Guardrails, Scaffold Planks, and Guardrail Posts. ALWAYS perform disassembly work in the
opposite direction of installation.
4. Stack all boards, planks, and Guardrail Posts on properly installed roof jacks, or safely lower all materials to
the ground. DO NOT OVERLOAD ROOF JACKS.
5. At sheer wall locations, attach compatible rope or webbing to previously installed Lowering Strap. While
another worker firmly holds the Lowering Strap, loosen Top Clamp Eyebolt and remove Top Clamp. Lower
Support Bracket to ground using selected rope or webbing.
6. For non-sheer wall locations, remove 3’, 2” x 4” Support Brace. Loosen Top Clamp Eyebolt, remove Top
Clamp, and bring Support Bracket onto the roof between the studs. Safely lower all materials to the ground.
Rail Clamp
Hanger Bracket Post
Outrigger
Hanger Bracket
Guardian Fall Protection 6305 S. 231st St., Kent, WA 98032 phone: (800) 466-6385 fax: (800) 670-7892 www.guardianfall.com