Product Manual
User Manual
Page 8
Issue 1
Rope Lock-off
To prevent pay out of rope and therefore halting descent there are integrated
rope lock-off points on each side of a MAX descender (R/PR models only).
Take rope entering the device
(non load bearing end)
Step 2:
Run the rope over the rope hook away
from the red plate
Step 3:
Thread the rope through the rope grip,
.... and pull to engage in grip
Step 1:
Step 1:
Take non load bearing rope entering the
device and pass it under the rope hook,
towards the red plate
Step 2:
Align the rope with the rope guide
Step 3:
Lay the rope across the full width of the
descender through the rope guide.
Step 4:
Run the rope under the rope hook away
from the red plate and finally through the
rope grips
Standard (Method 2)
Inverted (Method 3)










