Instructions / Assembly

Guardian Fall Protection 6305 S. 231st St., Kent, WA 98032 USA phone: (800) 466-6385 fax: (800) 670-7892 www.guardianfall.com
6
Prior to EACH use, inspect Cyclone Harness for deficiencies, including, but not limited to, corrosion,
deformation, pits, burrs, rough surfaces, sharp edges, cracking, rust, paint buildup, excessive heating,
alteration, broken stitching, fraying, and missing or illegible labels. IMMEDIATELY remove Cyclone Harness from
service if defects or damage are found, or if exposed to forces of fall arrest.
Ensure that applicable work area is free of all damage, including, but not limited to, debris, rot, rust, decay,
cracking, and hazardous materials. Ensure that selected work area will support the application-specific
minimum loads set forth in this instruction manual. Work area MUST be stable.
At least every 12 months, a Competent Person other than the user must inspect Cyclone Harness. Competent
Person inspections MUST be recorded in inspection log in instruction manual and on equipment
inspection grid label. The Competent Person must sign their initials in the box corresponding to the
month and year the inspection took place.
During inspection, consider all applications and hazards Cyclone Harness have been subjected to.
Inspection
Inspection Log
Date of First Use: __________________.
Product lifetime is indefinite, as long as product passes all inspection requirements. User must inspect
prior to EACH use. Competent Person other than user must complete formal inspection at least every
12 months. Competent Person to inspect and initial.
This inspection log must be specific to one Cyclone Harness. Separate inspection logs must be used for
each Cyclone Harness. All inspection records must be made visible and available to all users at all times.
If equipment fails inspection IMMEDIATELY REMOVE FROM SERVICE.