Third Party Verification Claim

INSPEC Test Report No: 2.16.05.18 Page 3 of 14
Summary of assessment*
Clause Requirement
Assessment
(See Key)
3.2 Energy absorber
See INSPEC Test
Report 2.16.04.05.
3.2.1 Material NAs
3.2.2 Terminations Ltd
3.2.3 Connectors NAs
3.2.4 Dynamic performance – ambient dry Pass
Dynamic performance – ambient wet Pass
Dynamic performance – cold dry Pass
3.2.5
Dynamic performance – hot dry
Pass
3.2.6 Static strength Pass
3.2.7 Static test for wrap-around lanyards (3600 lbf – abraded)
3.2.8 Static test for wrap-around lanyards (5000 lbf – unabraded)
3.2.9 Static test for Y-lanyards
3.2.10.1 Dynamic test for Y-lanyards (Single connection)
3.2.10.2 Dynamic test for Y-lanyards (Dual connection)
3.2.10.3 Dynamic test for Y-lanyards (Hip connection)
5.1 / 5.2 Marking Ltd
5.3 / 5.4 Instructions Ltd
Key
Shading shows the clauses requested. Any other clauses were not requested.
Pass Requirement satisfied.
Ltd Testing requested was insufficient completely to verify compliance with the clause.
Refer to the “Result details” section for more information.
Fail Requirement not satisfied. Refer to the “Result details” section for more information.
NAs Assessment not carried out.
NAp Requirement not applicable.
NT Requested but not tested due to early termination following failure.
* Assessment relates only to those specimens which were tested and are the subject of this report.