Safety Instructions
Installation Using the robot
1. Remove the EVA foam on each side.
2. Place the charging dock against the wall on a flat
surface and plug it into the power socket.
Note:
The charging dock should have more than 1.0m(3.0ft) of clearance on each side, and
more than 2.0m(6.0ft)in the front.
If the power cable is vertical to the ground, it may be caught by the robot, causing the
charging dock to be disconnected.
The charging dock indicator is on when the charging dock is electrified, and off when
the robot is charging.
more than 3ft/1m
more than 3ft/1mmore than 6ft/2m
6
3. Turn the robot over to install the side brushes.
Install the side brushes on both sides of the roller at the bottom of the main unit. Pick
up the side brushes with your hands and aim at the hole of the side brush installed on
the base(note that the square column and the square hole correspond to each other),
press it down to hear a “click" sound, indicating that the side brush is installed in place.
Install the side brushes