User Guide

34
Step 3
With the gate in the fully closed position and the operator retracted, swing the operator to the gate. Mark reference points for
bolt holes on gate cross member through middle of gate bracket slots. The operator must be level. (Some vertical adjustment
is possible by sliding the post bracket assembly up and down.) Drill
3
/8" holes into the gate cross member as marked. Fasten
gate bracket to cross member using (2) 3/8" x 3" bolts, washers, lock washers, and nuts. Attach the operator to the post
bracket assembly and gate bracket using clevis pins, bushings, and hairpins clips.
Step 4
Make sure the control box power switch is OFF. Use a small
screwdriver to move the
Number 1 DIP switch from the factory setting
(OFF / Pull-To-Open) to ON for Push-To-Open. Turn power switch
ON. The control board is now configured to push the gate open.
Setting the Open Position Limit
Step 1
Confirm that the power switch is in the ON position, and the gate is in the CLOSED POSITION.
Step 2
Activate your operator by pressing the entry transmitter button. Your gate should now be moving from the closed position
toward the open position. Prepare to STOP gate by pressing the entry transmitter button again when the gate reaches the
desired open position. This step may be repeated until desired open position is achieved. Once the desired OPEN position has
been achieved, proceed to Step 3.
Operator
Fence Post
Gate Post and Gate Cross Member
(In Closed Position)
POST PIVOT BRACKET level with the
horizontal surface of the GATE BRACKET
LEVEL
LEVEL
LEVE
L
1
ON
2 3 4
15
CHARGING
POWER
STATUS
RF
PULL-PUSH
MODE1
MODE2
LOCK/BEACON
OFF 120
MIN MAX
STALL FORCE
CLOSE TIME
SET
LIMIT
LEARN
REMOTE
AUX OUT
SOLAR
PA
NEL
18VAC
RCVR
GRN
BLK
RED
EXIT
SAFETY
EDGE
CYCLE
COMMON
LINK
1
ON
2 3 4
PULL-PUSH
MODE1
MODE2
LOCK/BEACON