
Hang and Grounding
• Hang the rest of the units in the following order: 1900 AMP
• Locate the two Mounting Sems Screws (M6 x10mm) underneath each unit. Tighten bolts until secure.
<Picture 3> Hanging the Rest of Units.
CAUTION
Units must be hung in the following order only: PSU -> 1900 AMP
8