User's Manual

Bell Mobility User Manual
In-building Repeater
15
4. SETUP
4.1. Equipment Needed for In-buildingRepeater Setup
Parameter Item Quantity Remark
Major Component Repeater GRS-DUO24M-BC 1 EA Provided by GST
Additional
Components
Mounting Bracket
CD which contains User Manual
V.1.0 and Installation Guide V.1.0
Ethernet Cable 6.6ft (2m)
Ground Cable 6.6ft (2m)
Ground Sems Screw M4 x 8mm
Bracket Sems Screw M6 x 16mm
Lag Screw 12.7mm x 50.8mm
Anchor Bolt Set 12.7mm x 50.8mm
1 EA
1 EA
1 EA
1 EA
4 EA
4 EA
4 EA
4 EA
Provided by GST
Antenna
Donor ANT
Server ANT
1 EA
1 EA
Not Included
RF Cable Antenna connection Cable TBD Not Included
Testing and Measuring
Equipment
Spectrum Analyzer 1 EA Not Included
4.1.1 Checkpoints before turning on the Repeater
1) System Power Check: AC electrical power to the repeater should be 110V, input electricity
only after power verification.
2) Input RF Signal Range: Optimal input RSSI into the repeater is -55dBm ~ -25dBm for
800MHz. User should verify input condition of Donor ANT. If the input RSSI exceeds -20dBm,
then external attenuators should be used.
3) Isolation check between DONOR/SERVER ANT: Isolation condition of this equipment is
87dBc (Gain+7dB) for 800MHz. User should check its condition before installation.