Installation and Operating Instructions

Table Of Contents
Fill
1
2
3
4
5
TM0713351
Designation Description
1 High level
2 Stop level
3 Start level P1: start level for pump 1
4 Start level P2: start level for pump 2
5 Dry-running level
In the filling application, the pump is installed in a tank
or well from where it pumps the liquid. The liquid is
pumped into a second tank where the level sensors
are installed.
The pump will start to fill the second tank when Start
level P1 is reached.
A second pump will start if the liquid level reaches
Start level P2.
The pump stops when the liquid level reaches Stop
level.
If the pump for some reason does not stop at Stop
level and the liquid level keeps rising, the High level
sensor will eventually register this. If set, the signal
from the High level sensor can be used to activate a
relay output which can then be used to indicate a
visual or acoustic alarm or send a signal to a SCADA
system via a communication interface.
If the pump is running and the liquid level in the tank
falls below the dry-running level, the dry-running
protection will stop the pump to ensure that it is not
damaged.
Related information
6.14.1 Automatic operation
4.4.1 Setting the application type with Grundfos
GO Remote
1. Go to Settings > Level control > Application
type.
2. Select the type.
Empty
Fill
Related information
3.3 Startup wizard on the operating panel
4.5 Terminals
1 2 3 64 5 7 8
TM070123
Pos. Description
1 Contactor for pump 1
2 Contactor for pump 2
3 Terminal block for the power supply
4
Terminal block for temperature and
moisture-protection sensor for pump 1
5
Terminal block for temperature and
moisture-protection sensor for pump 2
6 Relay output 1
7 Relay output 2
8 Analog and digital inputs and outputs.
13
English (GB)