Installation Guide

1. Confirm You Have the Correct Pump
Read the pump nameplate to make sure it is the one you ordered.
Compare the pump's nameplate data and its performance curve (for head,
GPM, etc.) with the application in which you plan to install it.
Will the pump do what you expect it to do?
2. Check the Condition of the Pump
The shipping carton your pump came in is specially designed around your pump during
production to prevent damage. As a precaution, it should remain in the carton until you are
ready to install it. At that point, look at the pump and examine it for any damage that may
have occurred during shipping. Examine any other parts of the shipment as well for any
visible damage.
SAFETY WARNING
Read This Booklet
This booklet is designed to help a certified installer install, begin operation of and troubleshoot
the Grundfos VersaFlo UPS pumps. It should be left with the owner of the pump for future
reference and information regarding its operation. Should the owner experience any problems
with the pump, a certified professional should be contacted.
Electrical Work
All electrical work should be performed by a qualified electrician in accordance with the latest
edition of the National Electrical Code, local codes and regulations.
Shock Hazard
A faulty motor or wiring can cause electrical shock that could be fatal, whether
touched directly or conducted through standing water. For this reason, proper
grounding of the pump to the power supply's grounding terminal is required for
safe installation and operation.
In all installations, the above-ground metal plumbing should be connected to the
power supply ground as described in Article 250-80 of the National Electrical
Code.
Risque de choc électrique
Un moteur ou un câblage défectueux peuvent causer un choc électrique qui
pourrait être fatal, soit par contact direct, soit par conduction à travers de l’eau
stagnante. Il faut donc mettre la pompe à la terre sur la borne de mise à la terre
de la source d’alimentation afin d’assurer une installation et un fonctionnement
sécuritaires.
Pour tous les types d’installations, la plomberie en métal de surface devrait être
raccordée à la mise à la terre de la source d’alimentation, tel qu’indiqué à l’Article
250-80 du Code national de l’électricité.
Pre-Installation Checklist
Page 1
Page 18
Notes