Install Instructions
7
English (US)
Fig. 5 Intake hose must slope slightly
upward
5.3 Adjusting the pressure switch
1. Establish the minimum desired pressure
value (leaving the pump).
2. Set the storage tank preloading pressure
to 3 psi less than the minimum pressure
level.
3. Turn nut #1 (large nut) clockwise to raise
cut-on/off pressures.
4. Turn nut #2 (small nut) clockwise to raise off
pressure only.
5.4 Converting from shallow well to
deep well operation
5.4.1 Conversion from deep well JP5-61DSA -
JP8-62DSA to convertible shallow well
JP5-61ASA - JP8-62ASA
Screw the nozzle into place on the ejector body
and the Venturi tube. Put O-rings into respective
places and fasten ejector body to the pump
using the two screws. See fig. 6.
5.4.2 Conversion from convertible shallow
well JP5-61ASA - JP8-62ASA to deep
well JP5-61DSA - JP8-62DSA
Loosen and remove the two screws connecting
the ejector body to the pump body. Save the
O-rings, the Venturi tube, and the nozzle.
Fig. 6 Convertible ejector kit installation
TM05 1182 2411
Note
Reference Square D pressure
switch inner cover for additional
information.
Note
Separate ejector is required to suit
specific suction lift needs.
TM05 1186 2411
Ejector body
O-rings
Pump body
Venturi tube
Nozzle
JP_JP-PS_US.book Page 7 Tuesday, July 19, 2011 8:07 PM










