Instructions / Assembly
www.gronomics.com East Bethel, MN USA 763-753-7374
Side Rail Assembly
3
Remove the two post caps from the Garden Wedge.
NOTE: The extension kit can be assembled on ether end of
the Garden Wedge.
Install four 45” x 5-5/8” side rails (Item 2) into the upper part
of the slots between the two corner posts and slide down.
2
2
Side Rail And End Side Rail Assembly
4
Install the four remaining 45” x 5-5/8” side rails (Item 2) into
the upper part of the slots between the two corner posts
and slide down.
Install the four end side rails (Item 6, 5, 4 & 3) into the
upper part of the slots between the two corner posts and
slide down.
2
6
5
4
3
Install the 43-3/8” x 2-1/2” bottom center rail (Item 8) with the
tapered edges of the rail facing down.
Install the fabric liner into the Garden Wedge.
Soil Capacity: 6.5 Cubic Feet
Bottom Center Rail Assembly
5
8
Remove the rubber cap from the post studs.
Align the hole of the 4” x 4” post cap (Item 9) with stud and
tighten until the cap makes contact with the post. Do not
overtighten.
Post Cap Assembly
7
9
Stud
Post Caps Removed
Install the two 43-3/4” x 5-1/2” shelves (Item 7) onto the side
rails on both sides of the Garden Wedge.
Top Rail Assembly
6
7


