Instructions / Assembly
WWW.gronomics.com East Bethel, MN USA   763-753-7374
Place the two remaining 12" x 8.25" x 1" side rails (Item
5)  together  and  place  between  the  two  4”  x  4”  x  31”
corner posts (Item 1).
Slide  the  side rails  into  the  corner  post slots  until  the
lock  pin  holes  of  the  side  rails  are  inside  the  corner
posts. Install locking pin through the locking pin hole of
the side rails.
Final End And Side Rail Assembly
7
1
5
1
Place  one  19"  x  5-3/4"  x  3/4"  corner  notched  bottom
board (Item 7) on each end of the garden bed.
Corner Notched Bottom Board Assembly
8
7
Place three 19" x 5-3/4" x 3/4" bottom boards (Item 6)
into the garden bed.
(Gap boards evenly to allow for water drainage).
Install the 4” x 4” x 1-1/2” post caps (Item 9) onto the
corner posts.
Place fabric liner (Item 8) into the garden bed.
Bottom Board And Post Cap Assembly
9
6
9
9
9
Completed Assembly
10



