Installation & Assembly

5
English
Installation Type #3
1. Install control unit and secure with screws, see Fig. [5].
2. Open the hot and cold integrated service stops, see Fig. [6].
3. While installation observe the right mounting position.
4. For installation of handle parts after adjustment, see Fig. [7].
Adjustment
Temperature setting, see Fig. [8].
Before the mixer is put into service, if the mixed water
temperature measured at the point of discharge varies from
the specified temperature set on the thermostat handle.
After any maintenance operation on the thermostatic
cartridge.
One or more separate volume control (D) (not supplied) are
required to control the water flow, see Fig. [8].
Open volume control by turning the lever (D), see Fig. [8].
1. Measure the temperature of the water emerging with a
thermometer.
2. Turn regulation nut (C) until the water emerging has reached
a temperature of 38 °C or 100 °F.
Reversed union (hot on right - cold on left). Replace
thermostatic cartridge, special cartridge for service is:
Ref. No.: 47 186 (3/4”) (see Page II).
5
6
7
8
C
38 °C
D
100 °F