Installation

4
English
Installation Type #2 19 881
1. Install control unit and secure with screws, see Fig. [5].
2. Close water flow by turning the yoke. The mark (A) must be
on top, you hear/feel a click in the yoke, see Fig. [6].
3. Open the hot and cold integrated service stops, see Fig. [7].
4. While installation observe the right mounting position.
5. Installation of handle parts after adjustement, see Figs. [7]
and [8].
If the pressure balancing valve is installed too deep, the
fitting depth can be increased by 25mm or 1" with an extension
set, Part No. 47 890, see page II.
Note: The preset maximum temperature will change if the inlet
temperatures change or the setting of the water heater
thermostat is altered or if the water inlet temperature is
fluctuating.
Operation, see Fig. [9].
Select knob (D) anti-clockwise:
- Open from cold to hot water flow.
Turn lever (E) left or right:
Open water outlet as pipeline installation is prepared.
- left open to top outlet
- right open to bottom outlet
The adjustable hot water limit stop (B) is factory set at a
position to limit maximum outlet temperature to below the hot
water supply temperature, see Fig. [7]. For installations where
there is need to modify the limit temperature, remove the limit
stop (B) and replace in a more clockwise position for colder
water, or more counter-clockwise position for hotter water.
Observe the mounting position of stop (C).
4
5
6
A
E
7
B
C
8
9
D
E
D
E