Operator's Manual

ETD-100 OPERATOR’S MANUAL
12
5 Installation and Setup
5.1 Setup Method
1. Unpack the device and Reagent Cartridge
Ensure the cardboard packaging and support material are retained for future shipment.
2. Install the Reagent Cartridge (If not already fitted)
Refer to Section 5.2 Installation of the Reagent Cartridge.
3. Install the Sample Trap Holder (If not already fitted)
Refer to Section 5.3 Installation of the Sample Trap Holder.
4. Install the Sample Filter (If not already fitted)
Refer to Section 5.4 Installation of the Sample Filter and Sample Filter Retainer
5. Plug in the power cable
Plug the DC power adapter plug into the device DC power port.
Insert the AC plug of the power adapter into a wall power outlet.
The Meanwell GST90A24-P1M power adapter and cable suitable must not be substituted with any other
power cable or adapter.
6. Turn on the device
Press the power button on the device. It should illuminate red.
The PIN code Screen will take approximately 30 seconds to load.
Enter the password PIN code provided with the GreyScan ETD-100 Quick Start Guide.
7. Calibration
Once the device is turned on, allow the device to complete internal calibration/initialisation tests. This will take
10-15 minutes to complete.
When internal calibration is complete, the INSERT SWAB Screen will be displayed, and the device is ready
for use.