Corp. Air Conditioner User Manual

13
Model VSU Make-Up Air
®®®®®
Direct Gas Burner Sequence
1. Supply Fan Contact Closed
Power passes to the supply fan and heat switch
2. Heat Contact Closed
Power passes to the heat relay then to the
Flame Safeguard
3. Flame Safeguard (FSG) Sequence
Checks for proper airow
Veries no ame present at burner
Initiates 10 second prepurge
Sends power to open pilot gas valve (V1) and
energizes the spark generator (SG) (clicking of
the spark generator may be heard)
Tries for up to 10 seconds to light pilot and
confirm flame
Powers the main gas valves open
Shuts down spark generator
Continuously monitors the ame and airow
Performs self-diagnostic check every ve
seconds
Operation - Electrical
Electrical Sequence
1. Supply Fan Contact (S2) Closed
Power passes to damper which opens
When damper is fully opened, damper relay
(D1) is energized an optional N.O. damper limit
switch (DL1) closes
Power passes through a N.C. fault contact on
soft starter (PST(FAULT))
Power passes to and energizes supply fan relay
(RI)
Supply fan starts
2. Heat Contact (S4) Closed
Power passes to N.O. fan relay which is
energized and closed
Power passes to inlet air sensor contact (TS)
which is energized and closed if the inlet air
temperature is below the set point
Power passes to and energizes the heat relay
(RH)
N.O. heat relay contact (RH) closes
Power passes to and energizes terminal 5 of the
Flame Safeguard (FSG).
Power passes to N.C. high limit control contact
(HLC) which is closed if temperature has
remained below the high limit set point
Power passes to terminal 6 of the Flame
Safeguard (FSG)
Flame Safeguard (FSG) begins direct gas burner
sequence (see Direct Gas Burner sequence)