Assembly Instructions Manual
Great Plains Mfg., Inc. Front Parts Installation Instructions 9
2014-06-16 Front Parts 118-598M
Close-Out
Raise the drill to transport height. Verify that the chains
lift the agitator to adequate ground clearance. If more
clearance is desired, move the upper bolts a few links
further down the chains.
Agitator Operation
The agitators engage/disengage automatically as the
drill is lowered and raised in field operations, and require
no change to normal operations.
Agitator Maintenance
• Check bolt torques periodically.










