Full Product Manual

EZ Pitched Roof System
26 of 30
Minimum Panel Height
End Clamp Attachment
Mid Clamp Attachment
There must be a minimum of 1.5 inches of Rail
extending beyond the PV panel frame.
Clamp the PV panel frame by inserting the T-Bolt
into the Rail slot. Position the End Clamp firmly
against the PV panel frame and secure using the
1/4-20 Collar Bolt. Using a 7/16” socket, torque to
7.5 ft. lbs.
Note: When two or more PV panels are installed
grounding via the End Clamp is optional. For a
single panel configuration (shown), insert the T-
Bolt into a T-Bolt Holder for grounding the panel to
the Rails.
Insert the T-Bolt in the Rail slot and turn
clockwise 90° to engage the head into the slot.
Insert Grounding T-Bolt Holder to lock T-Bolt in
place.
Thread the 1/4-20 Collar Bolt onto the top of the
T-Bolt as shown. After positioning the Mid
Clamp firmly against the PV panel frame, using
a 7/16” socket, tighten to 7.5 ft. lbs.
Minimum leading edge height to meet a
UL1703 PV module fire standard is 3 inches.
3 inch minimum
from bottom of PV module frame to the roof
covering