Full Product Manual

EZ Pitched Roof System
20 of 30
Installation Instructions:
EZ Roof Mount Kit K10068-XXX
1. From the marked location, move down the roof 2-1/4”
from the bottom of the shingle, and drill the pilot hole for
the Lag Bolt with a 7/32” drill bit. For maximum strength,
the hole should not be more than 3 in depth, and a drill
stop may be used to insure this.
2. Clean sawdust, and fill hole with sealant, such as Chem-
link M1 for wood and composite roofs, or ChemLink
DuraLink for metal roofs. Install AL Shoe to roof by using
5/16” Lag Bolt. Tighten to 25 ft. lbs. torque.
3. Make sure the Sealing Washer is positioned correctly on
the threaded shank of the AL Shoe. Use roofer bar to lift
roof shingle, slide the flashing under shingle, and insert
the Flashing on threaded shank as shown. For additional
waterproofing apply beads of sealant as shown.
4. Insert L-Foot to AL Shoe on top of Flashing. Place AL
Hex Cap on Shoe, and lightly hand tighten Hex Cap.
5. Install AL Rail to L-Foot to the specific orientation. Then,
tighten 3/8 Flange Nut to 15 ft-lbs. and Hex Cap to 15 ft-
lbs. torque.
2
3
4
5
1