Installation Guide

3 Installation
Chapter 3 contains information on assembling and installing this
equipment.
Installation Overview
1. Assemble the battery box(es) to the inverter.
2. Prepare the battery bank.
3. Assemble and prepare the renewable energy components (if used).
4. Connect the battery bank to the inverter.
5. Connect the DC sources (if used).
6. Connect the AC sources:
a) if hardwired: close utility input breaker, or
b) if softwired: plug AC cord into generator
7. If hardwired, close the disconnect in the AC Distribution Panel to
feed hardwired outlets.
8. Turn on power to the PowerHub.
9. Plug in the desired AC appliances.
DANGER
ELECTRICAL SHOCK AND FIRE HAZARDS
All wiring should be done by qualified personnel to ensure compliance with all
applicable installation codes and regulations.
Failure to follow these instructions will result in death or serious injury.
975-0289-01-01(PowerHub_1800_IG).book Page 1 Thursday, June 4, 2015 9:49 AM