Hardwired Permanent Applications
Utility Backup Applications
Important:
Installations of this kind must be certified/approved as
“code-compliant” to the national and local building and electrical codes.
Installers should have adequate knowledge of national and local code to ensure
the installation passes inspection by the local electric authority.
Figure 1-5
Hardwired Utility Applications
Example only.
Actual installation may vary.
Important:
The combination of loads
cannot exceed 1440 W. Run-times will depend
on the amp-hour rating of the batteries.
AC Distribution Panel
(Sub-Panel)
Main AC
Panel
120 Vac
Outlets
AC IN
AC OUT