Manual

9. Assembly
PNEG-1510 Top Dry 24', 30' and 36' Manual Batch 71
Perforated Center Band
Drill six (6) 3/8" diameter holes equally spaced as shown in Chart for top band clips. Attach clips using
5/16" x 3/4" bin bolts. Add perforated band sections. Note that these do not attach to the leveling bands
but hang down on the inside of the top inner leveling band. (See Figure 9V.)
Figure 9V
Nominal Diameter
of Tank (Ft.)
# of Holes Dimension
24' 6 25-1/4"
30' 6 22"
36' 12 30"
Nominal Diameter
of Tank (Ft.)
Part # “A” Qty
24' TD-100219 3
30' TD-100545 6
36' TD-100726 6