User guide
9. Assembly
PNEG-1276 Top Dry Autoflow Construction Manual 24', 30' and 36' 57
Perforated Center Band
Drill 3/8" diameter holes equally spaced as shown in Chart for top band clips. Attach clips using
5/16" x 3/4" bin bolts. Add perforated band sections. Note that these do not attach to the leveling bands
but hang down on the inside of the top inner leveling band. (See Figure 9H.)
Figure 9H
Nominal Diameter
of Tank (Ft.)
# of Holes Dimension
24' 6 25-1/4"
30' 6 22"
36' 12 30"
Nominal Diameter
of Tank (Ft.)
Part # “A” Qty
24' TD-100219 3
30' TD-100545 6
36' TD-100726 6










