User guide

8. Installation
PNEG-1276 Top Dry Autoflow Construction Manual 24', 30' and 36' 49
30' Leveling Band Locations (Continued)
Outer Leveling Bands
Figure 8T
30' Leveling Band Grain Depth Settings
30' Old New
Inner 30.2" Same
Middle 22.6" 16.6"
Outer 16.2" 12.2"
Dump Time Estimate (Corn at 105°) 40 Sec. 34 Sec.
Grain Temperature Sensor Distance from Floor 10-1/2" 8-1/2"