User guide

8. Installation
44 PNEG-1276 Top Dry Autoflow Construction Manual 24', 30' and 36'
24' Leveling Band Post Installation
Install the leveling band posts on the floor as shown in Figure 8M.
The fourth and eighth holes in the floor sheet indicate the location of the leveling band posts. Attach posts
with 5/16" x 1-1/4" bin bolts (S-277). The third hole from the bottom of the sheet, there will be
eight (8) posts (1 every third sheet). In the eighth hole there will be four (4) posts (1 every sixth sheet).
After all of the posts have been installed fill the unused holes with 5/16" x 1-1/4" bin bolts.
Figure 8M