Accessories PNEG-1840
4. 60'-105' Bin Manager Temperature Cable Bracket Instructions
PNEG-1840 60'-105' Bin Manager Temperature Cable Support Bracket Instructions 13
72' Temperature Cable Support Assembly
Figure 4B
Installation instructions: Attach left and right bracket assemblies to roof beams as shown in detail 4 on Page 14.
Adjust bracket position along the roof beam to the desired radius. Tighten all 1/2" bolts to a minimum torque of 120 ft. lbs.
Left bracket assembly
(See detail 4 on Page 14.)
Right bracket assembly
(See detail 4 on Page 14.)