Accessories PNEG-1802 User guide

4. Inside Ladder Installation
42 PNEG-1802 Inside Ladder Instructions
4.00" Corrugation Farm Commercial Hopper Tank (FCHT) 4-6 Rings
Inside Ladder Installation
The inside ladder package includes the ladders, starter brackets and double the amount of standoff
brackets. Position the ladder directly under the manhole roof panel as shown in Figure 4AM and install
starter brackets as shown in Figure 4AN on Page 43. Place the standoff brackets vertically on the sidewall
sheets every 22" using the horizontal seam holes for every other hole location. Use 5/16" x 3/4" bin bolts
to attach the standoff brackets to the sidewall of the grain bin.
Figure 4AM