Accessories PNEG-1802 User guide

4. Inside Ladder Installation
30 PNEG-1802 Inside Ladder Instructions
4.00" Corrugated Commercial Grain Bin
Inside Ladder Installation (without Stir-Ator)
Inside Ladder Placement
The inside ladder package includes the ladder, starter brackets and double the amount of standoff
brackets as the outside ladder package. Begin by positioning the ladder directly under the manhole roof
panel as shown in Figure 4X and install the starter brackets as shown in Figure 4Y on Page 31. Place the
standoff brackets every 22" vertically on the sidewall sheets using the horizontal seam holes for every
other hole location. Use 5/16" x 3/4" bin bolts to attach the standoff brackets to the sidewall of the grain bin.
Figure 4X