Accessories PNEG-1738 User Manual
4. Assembly Instructions
42 PNEG-1738 15'-135' “X” Series Roof Stairs, Peak and Manway Guard
Roof Stair Only Eave Platform Sub-Assemblies
“X” Series Platform Assembly
1. Figure 4V shows the assembly of the platform supports. Use 5/16" hardware at all the connection
points. (The bin wall and platform floor is hidden for clarity. Platform floor will have to be attached at
the same time as support angles.)
Figure 4V
2. Figure 4W shows the assembly of the platform post, handrail post, toe plate, platform corner post and
platform floor system. This must all be assembled at the same time using 5/16" hardware.
Figure 4W