5'-135' “X” Series Roof Stairs, Peak and Manway Guard Assembly Instructions PNEG-1738 Date: 03-22-13 PNEG-1738
PNEG-1738 15'-135' “X” Series Roof Stairs, Peak and Manway Guard
Table of Contents Contents Chapter 1 Introduction ..........................................................................................................................................4 Chapter 2 Safety .....................................................................................................................................................5 Safety Guidelines ..................................................................................................................................
1. Introduction READ THIS MANUAL carefully to learn how to properly use and install equipment. Failure to do so could result in personal injury or equipment damage. INSPECT the shipment immediately upon arrival. The customer is responsible for ensuring that all quantities are correct. The customer should report and note any damage or shortage on the bill of lading to justify their claim to the transport company.
2. Safety Safety Guidelines This manual contains information that is important for you, the owner/operator, to know and understand. This information relates to protecting personal safety and preventing equipment problems. It is the responsibility of the owner/operator to inform anyone operating or working in the area of this equipment of these safety guidelines. To help you recognize this information, we use the symbols that are defined below. Please read the manual and pay attention to these sections.
2. Safety General Safety Statement Our foremost concern is your safety and the safety of others associated with grain handling equipment. This manual is to help you understand safe operating procedures and some problems that may be encountered by the operator and other personnel. As owner and/or operator, you are responsible to know what requirements, hazards, and precautions exist and inform all personnel associated with the equipment or in the area. Safety precautions may be required from the personnel.
2. Safety Safety Instructions Our foremost concern is your safety and the safety of others associated with this equipment. We want to keep you as a customer. This manual is to help you understand safe operating procedures and some problems that may be encountered by the operator and other personnel. As owner and/or operator, it is your responsibility to know what requirements, hazards, and precautions exist, and to inform all personnel associated with the equipment or in the area.
2. Safety Prepare for Emergencies Be prepared if fire starts. Keep a first aid kit and fire extinguisher handy. Keep emergency numbers for doctors, ambulance service, hospital, and fire department near your telephone. Keep Emergency Equipment Quickly Accessible Wear Protective Clothing Wear close-fitting clothing and safety equipment appropriate to the job. Eye Protection Remove all jewelry. Gloves Tie long hair up and back. Wear safety glasses at all times to protect eyes from debris.
2. Safety Safety Sign-Off Sheet As a requirement of O.S.H.A., it is necessary for the employer to train the employee in the safe operating and safety procedures for this equipment. This sign-off sheet is provided for your convenience and personal record keeping. All unqualified persons are to stay out of the work area at all times. It is strongly recommended that another qualified person who knows the shut down procedure be in the area in the event of an emergency.
2. Safety Proper Storage of Grain Bin/Silo Materials Prior to Construction Wet storage stain (rust) will develop when closely packed bundles of galvanized material, such as sidewall and roof sheets, have moisture present. Inspect roof and sidewall bundles on arrival for any moisture. If moisture is present, it must not be allowed to remain between the sheets. Separate the sheets or panels immediately and wipe them down. Spray with a light oil or diesel fuel.
3. Decals The manufacturer does not warrant any roof damage caused by excessive vacuum or internal pressure from fans or other air moving systems. Adequate ventilation and/or “makeup air” devices should be provided for all powered air handling systems. The manufacturer does not recommend the use of downward flow systems (suction). Severe roof damage can result from any blockage of air passages. Running fans during high humidity/cold weather conditions can cause air exhaust or intake ports to freeze.
3. Decals ATTENTION: The decal shown below should be present on the outside of the door cover of the 2 ring, 24" porthole door cover and the roof manway cover. If a decal has been damaged or is missing in any of these locations, contact the manufacturer for a free replacement decal. GSI Decals 1004 E. Illinois St. Assumption, IL. 62510 Phone: 1-217-226-4421 Rotating flighting will kill or dismember. Flowing material will trap and suffocate. Crusted material will collapse and suffocate.
3. Decals ATTENTION: The decal shown below should be present on the outside of the door cover of the 2 ring, 24" porthole door cover and the roof manway cover. If a decal has been damaged or is missing in any of these locations, contact the manufacturer for a free replacement decal. GSI Decals 1004 E. Illinois St. Assumption, IL. 62510 Phone: 1-217-226-4421 WARNIN DON’T DO UNLOADING INSTRUCTIONS: 1. Use CENTER FLOOR OUTLET ONLY until NO grain remains above this outlet. 2.
4. Assembly Instructions “X” Series Roof Stairs “X” Series Roof Stairs - Quantity of Stair Sections Diameter Bottom 3 Step 3 Step Section 4 Step Section 15' 1 1 0 18' 1 0 1 21' 1 2 0 24' 1 0 2 27' 1 3 0 30' 1 3 0 36' 1 4 0 42' 1 4 1 48' 1 6 0 54' 1 5 1 60' 1 6 1 72' 1 6 2 75' 1 9 0 78' 1 7 2 90' 1 9 2 105' 1 13 1 135' 1 17 0 The chart above shows the number of each roof stair section required to fit the roof of a bin.
® Roof Stair Section Sub-Assembly Instructions and Details PNEG-1738 15'-135' “X” Series Roof Stairs, Peak and Manway Guard 15
4.
4.
4.
4.
NOTES 20 PNEG-1738 15'-135' “X” Series Roof Stairs, Peak and Manway Guard
® Platform, Manway and Roof Stair Interactions PNEG-1738 15'-135' “X” Series Roof Stairs, Peak and Manway Guard 21
4.
4.
4.
4.
4.
4.
4.
4. Assembly Instructions 24'-36' Roof Stair, Ladder Eave Platform and Manway Guard Interaction Figure 4L NOTE: 15'-21' and 42'-60' have similar roof stair placement.
NOTES 30 PNEG-1738 15'-135' “X” Series Roof Stairs, Peak and Manway Guard
® “X” Series and 40 Series Peak Walk Around PNEG-1738 15'-135' “X” Series Roof Stairs, Peak and Manway Guard 31
4. Assembly Instructions “X” Series 135' Peak Walk Around NOTE: Figure 4M below and Figure 4N on Page 33 can NOT be used for 40 Series bins, see Pages 34-36 for 40 Series walk around.
4.
4. Assembly Instructions 40 Series 60'-135' Diameter Bins Peak Cap Walk Around 40 Series 6' Peak Cap Walk Around NOTE: Figure 4O is used for 54' and 60' 40 Series bins.
4. Assembly Instructions 40 Series 60'-135' Diameter Bins Peak Cap Walk Around (Continued) 40 Series 10' Peak Cap Walk Around NOTE: Figure 4P is used for 72' through 105' 40 Series bins.
4. Assembly Instructions 40 Series 60'-135' Diameter Bins Peak Cap Walk Around (Continued) 40 Series 14' Peak Cap Walk Around NOTE: Figure 4Q is used for 135' 40 Series bin.
4. Assembly Instructions 14' Peak Walk Around Package for 72'-105' Bins 14' Peak Walk Around Assembled at 12" below Peak with 71" Flattop and 15" below Peak with 61" Flattop NOTE: Figure 4R below and Figure 4S on Page 38 can NOT be used for 40 Series bins.
4.
4. Assembly Instructions 10' Peak Walk Around Assembled at 3-1/4" below Peak with 33" Flattop NOTE: Figure 4T below and Figure 4U on Page 40 can NOT be used for 40 Series bins.
4.
® Roof Stair Only Platform Assembly PNEG-1738 15'-135' “X” Series Roof Stairs, Peak and Manway Guard 41
4. Assembly Instructions Roof Stair Only Eave Platform Sub-Assemblies “X” Series Platform Assembly 1. Figure 4V shows the assembly of the platform supports. Use 5/16" hardware at all the connection points. (The bin wall and platform floor is hidden for clarity. Platform floor will have to be attached at the same time as support angles.) Figure 4V 2. Figure 4W shows the assembly of the platform post, handrail post, toe plate, platform corner post and platform floor system.
4. Assembly Instructions Roof Stair Only Eave Platform Sub-Assemblies (Continued) 3. Figure 4X shows the assembly of the platform handrails. These must also be attached using 5/16" hardware.
4.
4. Assembly Instructions Roof Stair Only Eave Platform Sub-Assemblies (Continued) “X” Series Platform Assembly - Reverse 1. Figure 4Z shows the assembly of the platform supports. Use 5/16" hardware at all the connection points. (The bin wall and platform floor is hidden for clarity. Platform floor will have to be attached at the same time as support angles.) Figure 4Z 2. Figure 4AA shows the assembly of the platform toe plate, handrail post, platform post and platform floor system.
4. Assembly Instructions Roof Stair Only Eave Platform Sub-Assemblies (Continued) 3. Figure 4AB shows the assembly of the platform handrails. These must also be attached using 5/16" hardware.
4.
4. Assembly Instructions “X” Series Platform Assembly - Twin Bin Platform 1. Figure 4AD shows the assembly of the platform supports. Use 5/16" hardware at all the connection points. (The bin wall and platform floor is hidden for clarity. Platform floor will have to be attached at the same time as support angles.) Figure 4AD 2. Figure 4AE shows the assembly of the platform post, handrail post, toe plate, platform corner post and platform floor system.
4.
4. Assembly Instructions “X” Series Platform Assembly - Twin Bin Platform (Continued) 3. Figure 4AG shows the assembly of the platform handrails. These must also be attached using 5/16" hardware.
4. Assembly Instructions Safety Ring Interference Provision Align STX-0090 with safety ring. Field drill stair side rails and bolt STX-0090. Typical both sides of stairs.
4.
5. Warranty GSI Group, LLC Limited Warranty The GSI Group, LLC (“GSI”) warrants products which it manufactures to be free of defects in materials and workmanship under normal usage and conditions for a period of 12 months after sale to the original end-user or if a foreign sale, 14 months from arrival at port of discharge, whichever is earlier.
This equipment shall be installed in accordance with the current installation codes and applicable regulations, which should be carefully followed in all cases. Authorities having jurisdiction should be consulted before installations are made. GSI Group 1004 E. Illinois St. Assumption, IL 62510-0020 Phone: 1-217-226-4421 Fax: 1-217-226-4420 www.gsiag.