Accessories PNEG-1615 User guide
2. Installation
14 PNEG-1615 Heavy Duty Bin Stairs and Platform Assembly for 4.00" Corrugated Bin
2. Figure 2J shows the assembly of the stair bracing. As shown before in Figure 2C on Page 9, the first
vertical wall bracket will be located four (4) bolt spaces or 37-1/2" around the bin. 3/8" Hardware is
used at the four (4) connection points as shown. The outer two (2) mounting holes on the side and
the outer middle hole on the top of the horizontal wall bracket will be used to attach the step as shown
in Figure 2K.
Figure 2J Stair Bracing Inside View
Figure 2K Stair Bracing Outside View