Accessories PNEG-1614
2. Installation
PNEG-1614 Heavy Duty Bin Stairs and Platform Assembly for 2.66" Corrugated Bin 13
3. Figure 2K shows the assembly of the top two (2) steps. These steps are different than all the rest of
the steps and are color coded accordingly. Use 5/16" hardware at the connection points and refer to
Figure 2L below and Figure 2M, Figure 2N and Figure 2O on Page 14 for hole and slot usage for the
size bin. These illustrations will show how to align the holes on the attachment tabs with the slots of
the next step. Attach the tie straps on the inside and outside of the steps as shown.
Figure 2K
Figure 2L
Use special two (2) steps from STR1073 package
(Color code: Red) (See Figure 2H on Page 11.)
Bin diameters up to 60'