Accessories PNEG-066 Owner manual

11
PNEG-066 2.66" & 4.00" Side Draw Installation
2.66" Side Draw Systems
NOTE: Unload tubes and supports from rack & pinion down are not provided by G.S.I.
STARTING LOCATION: 2nd INSIDE
CORRUGATION OF THE 2nd RING
6th RING FROM TANK BASE
DETAIL "D" (EXTERNALLY STIFFENED)
8" TYP.
(20.32 cm)
FIRST HORIZONTAL
SEAM FROM EAVE
DETAIL "A" (EXTERNALLY STIFFENED)
26.667" TYP.
(67.73 cm)
2.667" TYP.
(6.77 cm)
INSIDE OF BIN
CHUTE
FIELD DRILL SIDEWALL
TO MATCH CHUTE.
(7/16" DIA. HOLES)
8th RING FROM
TANK BASE
7th HORIZONTAL SEAM
FROM TANK BASE
7th RING FROM
TANK BASE
CHUTE
8" (20.32 cm)
SIDE DRAW PLATE
12-3/4" TYP.
(32.39 cm)
16.333" TYP.
(41.49 cm)
6th HORIZONTAL SEAM
FROM TANK BASE
45°
2 & 3 Post (Externally Stiffened)
NOTE: When installing
the discharge weldment,
use the same 3/8" bolts as
the installtion rings
vertical seam. IE: If 3/8"
x 1-1/2" bolts were used,
utilize that size bolt.