Manual

2. Assembly Instructions
10 PNEG-1809 A13522V10CRG Assembly Instructions
4. Attach VTDL aeration floor angle to beam weldments at both ends, using both slots. 1/2" Hardware
used to attach the angle. See detail D below for instructions on how angle attaches to cross beam.
(Twelve (12) locations.) (See Figure 2D.)
Figure 2D