User guide
2. Recommended Method for Full Floor Installation
10 PNEG-1567 54' Cor-Lok and Cut-Lok Flooring
Installing the Undersplice
The undersplice should be installed underneath the planks at the split after both plank lengths have been
butted together. Each splice has to be laid as each row of planks are laid rather than after all have been
placed. Figure 2D shows the layout of the undersplice plates and the screw pattern used to secure them.
Figure 2D Pattern for Fastening Splice to Planks