User's Manual

Pressure Relief Procedure
3A2776D 39
7. Open recirculation ball valves.
8. Disengage trigger lock.
9. Hold a metal part of the gun firmly to a grounded
metal pail. Trigger gun to relieve pressure in mate-
rial hoses. Use a pail lid with a hole to dispense
through. Seal around hole and gun with a rag to pre-
vent splash back.
10. Engage trigger lock.
11. Close mix manifold material ball valves.
12. Perform Flush Mixed Material procedure beginning
on page 36 to prevent mixed material curing in the
system and to relieve pressure in the solvent lines.
13.
If the system will be shutdown for more than a few
hours,
fill metering pump A and B packing nuts with
throat seal liquid (TSL).
NOTE: Fluid pressure in the system is now relieved.
WLD
TI19265a1
TI1953a
TI19265a2
ti20129a