User's Manual
Spray
32 3A2776D
Spray
This procedure includes steps ensure that any settled
fillers are well-mixed with the material, the metering
pump lines are fully primed, the metering pump check
valves are operating smoothly, and materials are up to
temperature prior to spraying the production surface.
When the temperatures displayed on the Supply screen
reach operating temperature, the material is ready to
spray.
After the first day of spraying follow Pressure Relief
Procedure, page 38, then tighten packing nuts on
pumps and dosing valves.
1. If this is the Initial Startup or if system components
have been replaced, follow the Initial Startup pro-
cedure beginning on page 24.
2. Turn main power switch ON and verify the XM PFP
air supply ball valve is open.
3. Perform Prime Solvent Flush Pump, page 29 to
ensure the solvent pump is prepared to quickly flush
out mixed material when done spraying.
NOTE:
If the optional hot water flush kit is used,
the
water heater must be filled with fluid then turned on 45
minutes prior to when flushing will be required.
4. If tank levels are low, fill them with material. See
step 7 on page 24.
5. Open both ball valves on the feed module air con-
trols.
6. Close mix manifold flush valves.
7. Close mix manifold ball valves.
Do not point gun at anyone or at any part of the body.
Solvent can irritate eyes, nose, throat, and skin. Hot
fluid and parts can burn skin. Wear appropriate pro-
tective wear when using flush solvents and/or if fluid
temperature exceeds 110° F (43° C).
F
IG
. 31
FEED PUMP
BYPASS
ti20127a
ti20095a
ti20129a