User's Manual
Initial Startup
28 3A2776D
23. Prime the A material hose:
a. Remove the outlet fitting from the mix manifold
so materials can be dispensed without mixing.
b. Place a waste pail under the mix manifold out-
let.
c. Open the A side mix manifold inlet ball valve.
d. Press repeatedly to set to
.
Press .
Slowly turn metering pump air regulator (CD)
clockwise to increase air pressure until metering
pump A starts. Continue until clean material dis-
penses from the A material line then press
to stop pump.
e. Close the A side mix manifold inlet ball valve
then reconnect to the mix manifold. Back out
the metering pump air regulator.
f. Repeat for the B material line.
NOTE: Now all of the material lines are primed except
for the section from the mix manifold to the gun.
24. Perform the Prime Solvent Flush Pump procedure
on page 29 to flush out the oil from those lines, and
to finish preparing for spraying.
Outlet
Fitting
B Valve
A Valve
ti20088a