User's Manual

Initial Startup
3A2776D 27
NOTE: To run each side independently, press
repeatedly to set to
or
. Press and as
needed to prime. Monitor containers to avoid overflow.
NOTE: When priming or flushing pumps, it is normal to
get cavitation or pump runaway alarms. Press to
clear alarms then press again as necessary.
These alarms prevent excessive pump speeds, which
will damage pump packings.
16. Repeat the previous step for the B side.
17. Back out the tank air pressure regulator on the feed
system air controls and open the brass valve on the
tank lid.
18. With the tank air pressure relieved, remove tank
port plugs and reconnect the tank return lines.
19. Adjust the tank air pressure regulator back to the
desired pressure.
20. Close the circulation valves.
21. Prime the A sampling valve:
a. Press repeatedly to set to
.
Press .
Slowly turn metering pump air regulator (CD)
clockwise to increase air pressure until metering
pump A starts.
b. With a waste container beneath the valve, open
the A sampling valve slowly until clean material
dispenses then close the sampling valve.
22. Repeat the previous step to prime the B sampling
valve.
NOTICE
Prior to performing the following step, make sure
the tank is not more than half full. When the tank
pressure is relieved, the fluid will expand, and could
overfill the tank if there is too much in the tank.
F
IG
. 30
FEED PUMP
BYPASS
ti20127a
WLD
ti20109a