User's Manual
Control Board, Toggle Switches and Display Replacement
3A2593B Repair 27
5. Feed toggle switches through control panel and
install two toggle switch nuts.
6. Install Fuse, see page 29. Check control, switches
and display.
7. Install splash shield with two screws.
8. Install control shroud with six screws.
9. Install pad and tighten four screws.
10. Install front shield and tighten six screws.
11. Install tank, lid and siphon tube.
12. If control board was replaced, calibrate distance
sensor (see Operation manual).
ti19691a
ti19705a
ti19098a
ti19171a
ti19200a
ti24917a
ti24917a