User's Manual

Meter Calibration
76 3A1080C
Meter Calibration
Calibrate the meter:
The first time the system is operated.
Whenever new materials are used in the system,
especially if the materials have viscosities that differ
significantly.
At least once per month as part of regular mainte-
nance.
Whenever a flow meter is serviced or replaced.
NOTE:
K-Factors on the Calibration Screen are
updated automatically after the calibration pro-
cedure is completed.
K-Factor values on the screen are viewable
only. If needed, you can manually edit the
K-Factors in Advanced Setup Screen 4 (see
page 37) or Recipe Setup Screen 5 (page 42).
All values on this screen are in cc, independent
of the units set in Configure Screen 1.
The controller will use the active recipe
K-factors for meter calibration. The active recipe
must be recipe 1 to recipe 60. Recipes 0 and 61
do not have K-factor values.
1. Before calibrating meter A, prime the system with
material. For a color change system, make sure the
color valve is open.
2. Shut off all spray or dispense devices connected to
the ProControl 1KS.
3. Place the beaker (minimum size - 250 cc) to capture
fluid from the gun.
4. On the EasyKey, press the Setup key to access
setup screens.
5. Press the Right Arrow key to select the Cali-
bration Screen. Press
the Enter key to select
Dose Valve A. Press the Down Arrow
key and
select Start from the menu. Start only one at a time.
6. Dispense a minimum of 250 cc into beaker; make
sure enough material is dispensed to accurately
read the volume with your beaker.
7. The volume that the ProControl 1KS measured dis-
plays on the EasyKey.