User's Manual

Operation
3A0417D 19
Operation
Before operation verify:
The lubricator does not have any visible
damage.
The lubricator canister is filled with the
requested grease or oil.
For oil filled lubrication canisters, an oil
throttle must be attached.
The “VOL” switches 3 and 4 of the 4-way
code switch match the correct size of the
lubrication canister.
The “TIME” switches 1 and 2 of the 4-way
code switch in the drive unit match the
desired discharge period.
All components are properly assembled
and screwed together hand tight.
To begin the discharge:
Plug power cable into lubricator (FIG. 8).
.
During Operation:
Carry out regular performance checks.
Check for possible leakages and the status
of the lubricator.
Regularly monitor the fill-level of the trans-
parent lubrication canister.
FIG. 8