User's Manual
Operation
3A0417D 19
Operation
Before operation verify:
• The lubricator does not have any visible
damage.
• The lubricator canister is filled with the
requested grease or oil.
• For oil filled lubrication canisters, an oil
throttle must be attached.
• The “VOL” switches 3 and 4 of the 4-way
code switch match the correct size of the
lubrication canister.
• The “TIME” switches 1 and 2 of the 4-way
code switch in the drive unit match the
desired discharge period.
• All components are properly assembled
and screwed together hand tight.
To begin the discharge:
Plug power cable into lubricator (FIG. 8).
.
During Operation:
• Carry out regular performance checks.
Check for possible leakages and the status
of the lubricator.
• Regularly monitor the fill-level of the trans-
parent lubrication canister.
FIG. 8










