User's Manual

Maintenance
36 3A0260H
Maintenance
Prior to performing any maintenance procedures, follow
the Pressure Relief Procedure on page 28.
Maintenance Schedule
The following tables list the recommended maintenance procedures and frequencies to operate the equipment safely.
The maintenance is divided between mechanical and electrical tasks. Maintenance must be performed by trained
personnel per this schedule to assure safety and reliability of the equipment.
Mechanical
Electrical
* Check Component Manual for more detailed maintenance information.
Operator Maintenance Person
Task Daily Weekly Monthly
3-6
months
or
125,000
cycles
18-24
months
or
500,000
cycles
36-48
months
or
1,000,000
cycles
As
Required
Inspect system for leaks
Depressurize fluid, after opera-
tion
Remove heat from system,
after operation
Inspect filter (234967) bowls
and drain
Check hoses for wear
Check/tighten fluid connections
Check/tighten air connections
Lubricate dispense valves*
Replace gear meter seals
Rebuild dispense valve*
Replace air filter
Replace Solenoid
Replace gear meter drive shaft
Replace gear head
* Check component manual for more detailed maintenance information.
Task Weekly
Check cables for wear
Verify cable connections
Verify operation of “System Stop” button