User's Manual

Setup
18 3A0238P
Connect Material Hoses to
System
For System With Circulation
1. Connect the A (red) and B (blue) supply hoses, from
hose kit (3), to the GMS material manifold. See FIG.
11.
2. Connect the other end of the supply hoses to the
applicator. See the applicator manual for fluid inlet
identification.
NOTE: The circulation hoses contain a 10 ft (3 m)
extension hose to reach the tank stands.
3. Connect the other end of the A (red) circulation
hose (421) to the fluid inlet fitting on the A (red) tank
stand. See FIG. 11 and FIG. 12.
4. Connect the other end of the B (blue) circulation
hose (422) to the fluid inlet fitting on the B (blue)
tank stand.
5. Tighten each fitting.
For System Without Circulation
1. Connect the A (red) and B (blue) supply hoses, from
hose kit (3), to the GMS material manifold. See FIG.
11.
2. Connect the other end of the supply hoses to the
applicator. See the applicator manual for fluid inlet
identification.
3. Hand tighten each fitting.
4. Tighten each fittings 1-1/2 flats past hand tight.
NOTICE
Avoid routing hoses in walkway areas to prevent
operators from tripping on hoses running between
system components. This also prevents fittings from
leaking.
FIG.11
3
421
GMS material
manifold
422
A
B
FIG. 12: Tank Stand Connections
NOTICE
Avoid routing hoses in walkway areas to prevent
operators from tripping on hoses running between
system components. This also prevents fittings from
leaking.
fluid inlet
fitting
r_257968_3a0238_1c