User's Manual
Setup/Startup
333388B Operation 9
Setup/Startup
1. Perform
Grounding Procedure (For Flammable
Materials Only)
, page 8
if using flammable
materials.
2. Fill both (2) throat packing nuts with Throat Seal Liq-
uid (TSL) to decrease packing wear.
3. Check engine oil level. Add SAE 10W-30 (summer)
or 5W-30 (winter). See engine manual.
4. Fill fuel tank.
5. Set both (2) pump valves to
OFF
.
6. If removed, install both (2) strainers.
7. Turn both (2) prime valves down. Turn pressure con-
trol counterclockwise to lowest pressure.
NOTE: Minimum hose size allowable for proper
sprayer operation is 3/8 in. x 11 ft (9.5mm x 3.3m).
8. Place both (2) siphon tube sets in grounded metal
pail partially filled with flushing fluid. Attach ground
wire to true earth ground. Use water to flush
water-base paint and mineral spirits to flush oil-base
paint and storage oil.
9. Apply brake.
This equipment stays pressurized until pressure is
manually relieved. To help prevent serious injury
from pressurized fluid, such as skin injection,
splashing fluid and moving parts, follow the Pressure
Relief Procedure when you stop spraying and before
cleaning, checking, or servicing the equipment.
ti3307a
ti3308a
ti3309a
ti23144a
ti3430a
ti6473a
ti3441a
PAINT
FLUSH
ti3310a
ti18550a










