User's Manual
Setup M ode Scree
ns
Calibrate Scr
een 1
Calibrate Screen 1 initiates a pump pressure check
(stall test) for the selected pump. During the test, the
Stall Test screen will appear.
The pump and lines must be primed with color
or catalyst before doing the stall test. See
System Screen 2, page 40 to set test parameters.
See Pump Pressure Check, page 57 for complete
test instructions.
To initiate the test, press the Pressure Check
button for the desired pump. The pump will build
pressure in the line to a minimum of the Stall Test
Pressure. The pump will then move to the center
stroke position and stall test the upstroke, followed
by the downstroke.
NOTE: TheLastPassedlogcanonlyberesetby
successfully completing the test.
The screen displays the number of days since the
last stall test was passed for each pump.
Figure 49 Calibrate Screen 1
Figure 50 Stall Test Screen
Calibrate Scr
een 2
Calibrate Screen 2 initiates a volume test for the
selected pump. During the test, the Volume Check
screen will appear.
The pump and l
ines must be primed with color
or catalyst b
efore doing the Volume Check. See
Pump Volume C
heck, page 58 for complete test
instructio
ns.
To initiate
the test, press the Volume Check
button for
the desired pump.
The screen displays the volume dispensed. Press
to end the test.
Press an
d hold the Reset button
for 1-2
seconds
to reset the volume counter.
Figure 51 Calibrate Screen 2
F
igure 52 Volume Check Screen
332562B 51